{"id":2290,"date":"2020-12-26T22:00:15","date_gmt":"2020-12-26T22:00:15","guid":{"rendered":"https:\/\/acgearmotor.top\/yc-torque-motor-for-washing-machine-with-aluminum-bar-rotor\/"},"modified":"2020-12-26T22:00:15","modified_gmt":"2020-12-26T22:00:15","slug":"yc-torque-motor-for-washing-machine-with-aluminum-bar-rotor","status":"publish","type":"post","link":"https:\/\/acgearmotor.top\/fi\/yc-torque-motor-for-washing-machine-with-aluminum-bar-rotor\/","title":{"rendered":"Yc Torque Motor for Washing Machine with Aluminum-Bar Rotor"},"content":{"rendered":"

\"Yc<\/p>\n

CZPT Introdution&colon<\/p>\n

\u00a0 \u00a0\u00a01&periodYC series solitary-phase asynchronous motor is frequently identified as a capacitor begin motor&interval One section motor stator winding has a main winding and a secondary winding&comma the section distinction of 90 levels in space&comma We know that the solitary-stage motor is the principal winding of the magnetic field is generated pulsating magnetic subject&comma by means of the secondary winding and capacitor break up stage&comma in purchase to generate a fixed rotation path of the magnetic area&comma when the velocity exceeds the70-eighty&percnt position&comma the centrifugal swap will cut off the secondary winding and the commence capacitor&comma capacitor start off motor is characterised by large starting torque&comma starting torque is increased than one&period8&comma reduced electricity issue&comma employed to begin demanding conditions&comma forged iron shell motor&interval<\/p>\n

\u00a0 \u00a02&periodYC collection heavy-responsibility capacitor begin motor&comma YC collection of little energy motors&comma aluminum shell MC sequence capacitor start motor&interval Composition need to have a centrifugal change and starting up capacitor&comma with a large commencing torque and excellent procedure efficiency&comma little volume&comma mild bodyweight&comma reduced sounds&comma hassle-free maintenance&period YC series solitary-stage asynchronous motor utilized to common equipment and equipment CZPT unique requirements&comma these kinds of as agricultural equipment&comma foods machinery&comma fan&comma water pump&comma equipment&comma mixing machine&comma air compressor&interval<\/p>\n

Comprehensive Requirements&colon<\/p>\n

YC MOTOR TECHNICALDATA<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
Model\u00a0No&interval<\/td>\nRated\u00a0Power<\/td>\n\n

Current\u00a0<\/p>\n

\u00a0 \u00a0&lparA&rpar<\/p>\n<\/td>\n

\n

Speed<\/p>\n

&lparr&solmin&rpar<\/p>\n<\/td>\n

\n

EFF&period of time<\/p>\n

&lpar&percnt&rpar<\/p>\n<\/td>\n

\n

Power\u00a0Factor<\/p>\n

\u00a0 \u00a0 &lparCos\u03c6&rpar<\/p>\n<\/td>\n

LRT&solFLT<\/td>\nLRC&solFLC<\/td>\nPOT&solFLT<\/td>\n<\/tr>\n
KW<\/td>\nHP<\/td>\n<\/tr>\n
220V\u00a050Hz\u00a0Synchronous\u00a0Speed\u00a03000r&solmin\u00a0&lpar2Pole&rpar<\/td>\n<\/tr>\n
YC80A-2<\/td>\n&period37<\/td>\n&period5<\/td>\n3&period7<\/td>\n2880<\/td>\n62<\/td>\n&period73<\/td>\ntwo&period8<\/td>\n6&period5<\/td>\n1&period8<\/td>\n<\/tr>\n
YC80B-2<\/td>\n&period55<\/td>\n&period75<\/td>\nfive&period3<\/td>\n2880<\/td>\nsixty five<\/td>\n&period73<\/td>\ntwo&period8<\/td>\n6&period5<\/td>\none&period8<\/td>\n<\/tr>\n
YC80C-2<\/td>\n&period75<\/td>\n1<\/td>\n6&period7<\/td>\n2880<\/td>\n68<\/td>\n&period75<\/td>\n2&period8<\/td>\n6&period5<\/td>\none&period8<\/td>\n<\/tr>\n
YC90S-2<\/td>\n1&period1<\/td>\n1&period5<\/td>\nnine&period1<\/td>\n2880<\/td>\nseventy one<\/td>\n&period77<\/td>\ntwo&period4<\/td>\n7<\/td>\none&period8<\/td>\n<\/tr>\n
YC90L-2<\/td>\none&period5<\/td>\ntwo<\/td>\n12&period1<\/td>\n2900<\/td>\n72<\/td>\n&period78<\/td>\n2&period4<\/td>\nseven<\/td>\n1&period8<\/td>\n<\/tr>\n
YC100L-two<\/td>\n2&period2<\/td>\n3<\/td>\n17&period1<\/td>\n2900<\/td>\n74<\/td>\n&period79<\/td>\n2&period1<\/td>\n7<\/td>\n1&period8<\/td>\n<\/tr>\n
220V\u00a050Hz\u00a0Synchronous\u00a0Speed\u00a01500r&solmin\u00a0&lpar4Pole&rpar<\/td>\n<\/tr>\n
YC80A-4<\/td>\n&period25<\/td>\n&period33<\/td>\nthree&period4<\/td>\n1450<\/td>\n56<\/td>\n&period6<\/td>\n2&period8<\/td>\n6<\/td>\n1&period8<\/td>\n<\/tr>\n
YC80B-four<\/td>\n&period37<\/td>\n&period5<\/td>\n4&period5<\/td>\n1450<\/td>\n60<\/td>\n&period62<\/td>\ntwo&period8<\/td>\n6<\/td>\none&period8<\/td>\n<\/tr>\n
YC80C-4<\/td>\n&period55<\/td>\n&period75<\/td>\nsix<\/td>\n1450<\/td>\n64<\/td>\n&period65<\/td>\ntwo&period8<\/td>\nsix<\/td>\n1&period8<\/td>\n<\/tr>\n
YC90S-four<\/td>\n&period75<\/td>\n1<\/td>\nseven&period7<\/td>\n1450<\/td>\nsixty seven<\/td>\n&period66<\/td>\ntwo&period4<\/td>\n6&period5<\/td>\n1&period8<\/td>\n<\/tr>\n
YC90L-four<\/td>\n1&period1<\/td>\none&period5<\/td>\nten&period5<\/td>\n1450<\/td>\n70<\/td>\n&period68<\/td>\ntwo&period4<\/td>\n6&period5<\/td>\n1&period8<\/td>\n<\/tr>\n
YC100L-4<\/td>\none&period5<\/td>\ntwo<\/td>\nthirteen&period5<\/td>\n1450<\/td>\nseventy two<\/td>\n&period7<\/td>\n2&period4<\/td>\n6&period5<\/td>\none&period8<\/td>\n<\/tr>\n
YC112M-four<\/td>\n2&period2<\/td>\nthree<\/td>\n19&period3<\/td>\n1450<\/td>\nseventy two<\/td>\n&period72<\/td>\n2&period2<\/td>\n6&period5<\/td>\none&period8<\/td>\n<\/tr>\n
YC132SA-four<\/td>\n3<\/td>\nfour<\/td>\ntwenty five&period2<\/td>\n1450<\/td>\nseventy four<\/td>\n&period73<\/td>\ntwo&period1<\/td>\n6&period5<\/td>\none&period8<\/td>\n<\/tr>\n
YC132SB-four<\/td>\n3&period7<\/td>\nfive<\/td>\nthirty<\/td>\n1450<\/td>\nseventy five<\/td>\n&period74<\/td>\n2&period1<\/td>\n6&period5<\/td>\n1&period8
\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

FAQ&colon<\/p>\n

Q&colon Do you provide OEM service&quest<\/p>\n

A&colon Sure<\/p>\n

Q&colon What is your payment term&quest<\/p>\n

A&colon thirty&percnt T&solT as deposit in advance&comma 70&percnt equilibrium receipt of the copy of B&solL or prior to cargo&period<\/p>\n

Q&colon What is your lead time&quest<\/p>\n

A&colon About 25 times following receipt the deposit or unique irrevocable L&solC&period of time<\/p>\n

Q&colon What certifiicate do you have&quest<\/p>\n

A&colon We have CE&comma ISO&period of time And we can use for particular certificate for various place these kinds of as COI for Iran&comma SASO for Saudi Arabia&comma etc&period
Our\u00a0Production&colon\u00a0\u00a0<\/p>\n

Our Packing and Loading&colon\u00a0\u00a0<\/p>\n

\u00a0<\/p>\n

\u00a0<\/p>\n

\u00a0<\/p>\n

\n

\"Yc<\/p>","protected":false},"excerpt":{"rendered":"

CZPT Introdution&colon \u00a0 \u00a0\u00a01&periodYC series solitary-phase asynchronous motor is frequently identified as a capacitor begin motor&interval One section motor stator winding has a main winding and a secondary winding&comma the section distinction of 90 levels in space&comma We know that the solitary-stage motor is the principal winding of the magnetic field is generated pulsating magnetic […]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[2],"tags":[],"class_list":["post-2290","post","type-post","status-publish","format-standard","hentry","category-product-catalog"],"_links":{"self":[{"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/posts\/2290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/comments?post=2290"}],"version-history":[{"count":0,"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/posts\/2290\/revisions"}],"wp:attachment":[{"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/media?parent=2290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/categories?post=2290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/acgearmotor.top\/fi\/wp-json\/wp\/v2\/tags?post=2290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}