one. Attributes:
1. High efficiency: 92%-ninety seven%
2. Compact composition: Little offset output, two stage and three stage are in the same box.
3. High precision: the equipment is created of substantial-high quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to make certain large precision and secure managing.
four. High interchangeability: highly modular, serial style, robust versatility and interchangeability.
2. CZPT parameters
| Ratio | three.forty one-289.74 |
| Input power | .twelve-160KW |
| Output torque | 61-23200N.m |
| Output velocity | 5-415rpm |
| Mounting kind | Foot mounted, flange mounted, foot and flange mounted, one-phase foot mounted, single phase flange mounted, Flange-mounted with prolonged bearing hub |
| Input Strategy | Flange enter(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
| Brake Launch | HF-manual launch(lock in the brake release position), HR-handbook release(autom-atic braking place) |
| Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor security Bimetal swotch) |
| Mounting Placement | M1, M2, M3, M4, M5, M6 |
| Type | R17-R167 |
| Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
| Housing material | HT200 high-power forged iron from R37,47,57,67,seventy seven,87 |
| Housing materials | HT250 Large toughness solid iron from R97 107,137,147,157,167,187 |
| Warmth treatment technology | carbonitriding and hardening treatment |
| Efficiency | 92%-97% |
| Lubricant | VG220 |
| Defense Class | IP55, F class |
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a point out-owned military mould organization, was set up in 1965. CZPTshine specializes in the comprehensive energy transmission answer for high-finish gear production industries based mostly on the aim of “Platform Product, Application Layout and Professional Service”.
CZPTshine have a strong technological drive with over 350 personnel at existing, including over thirty engineering technicians, thirty good quality inspectors, masking an area of 80000 sq. meters and types of innovative processing machines and testing equipments. We have a good foundation for the sector software improvement and service of high-finish pace reducers & variators possessing to the provincial engineering engineering analysis heart,the lab of gear velocity reducers, and the foundation of present day R&D.
Our Staff
Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery
AC Gear Motor for Retort Sterilizers 121 degrees Celsius, saturated steam, 90 minutes per cycle,…
AC Gear Motor for Vacuum Packaging Machines Running a vacuum pump at 2 900 rpm…
AC Gear Motor for Frozen Spiral Conveyors Minus 35 degrees, 100 percent humidity, ice buildup…
AC Gear Motor for Industrial Food Mixers From thin syrups to stiff bread dough —…
AC Gear Motor for Food-Grade Conveyor Belts Designed for daily CIP washdown, continuous product flow,…
AC Gear Motor for Palletizing Robots Hundreds of reversals per hour, high-inertia arm loads, and…